|
|
Hospitals
Inspections
To determine compliance with operational, care, treatment and physical
plant standards, the Department inspects the hospital prior to and following licensure.
The Department determines compliance through on-site inspections, review of schematic and
construction plans, and reports of qualified inspectors.
Initial Inspections ( 175 NAC 9 Sections 005.01-005.02E):
The Department must conduct an initial on-site inspection to determine compliance with
175 NAC 9 Sections 006 and 007. The inspection must occur within 30 working days, or later
if requested by the applicant, of receipt of a completed application for an initial
license. The Department must provide a copy of the inspection report to the hospital
within ten working days after completion of an inspection.
Physical Plant Inspections (175 NAC 9 Sections 005.03-005.03B2):
The Department must conduct inspections for conformity with construction plans and
compliance with 175 NAC 9 Section 007 at new facilities or new construction prior to
use or occupancy.
Compliance Inspections (175 NAC 9 Sections 005.04-005.06B):
The Department may conduct an onsite inspection at any time as deemed necessary.
|

Professions and Occupations Home
Licensure Unit
Documents in
PDF format require the use of Adobe Acrobat Reader
which can be downloaded for free from Adobe Systems,
Inc.